Landing at the SLF Postlanding Processing Towing to the OPF The OPF Highbay OMS Pod Installation SSME Installation OPF Rollout
Rollover from the OPF to the VAB Orbiter lifting ops in the VAB Shuttle Rollout from the VAB Clear the Hibay Doors and Headed for the Pad Shuttle and Crawler/Transporter Hydrogen Vent Arm pad ops GOX Vent Arm and Beanie Cap
The Crew headed toward the Pad The Orbiter Access Arm Getting ready to enter the Orbiter STS-1 Liftoff STS-41G Liftoff STS-26R Liftoff STS-49 Liftoff